PROGRAMA:
Jazigo/Capela no Cemitério de Joane, PT
CLIENTE: Mário da Costa Ferreira
ESTADO: Construído (Julho 2009)
Obra Embargada entre Out 2008 e Maio 2009
· · • • · • · · •
PROGRAM:
Mausoleum in Joane Cemetery, PT
CLIENT: Mário da Costa Ferreira
STATUS: Completed (July 2009)
Works have been stopped between October 2008 and May 2009 by City Council order
EQUIPA TÉCNICA (clique aqui)
ARQUITECTURA: ZapGun (2008)
ESTRUTURAS: A400
EMPREITEIRO GERAL:
Ribeiro da Silva Lda.
PERFURAÇÃO POR CAROTAGEM:
Furobetão, Lda.
· · • • · • · · • · · ·
TECHNICAL TEAM (click here)
ARCHITECTURE: ZapGun (2008)
STRUCTURE: A400
GENERAL CONTRACTOR:
Ribeiro da Silva Lda.
CORE DRILLING SERVICE:
Furobetão, Lda.
ESTUDO PRÉVIO • PRELIMINARY STUDY